Landscaping finished

Managed to get the brick edging laid today so that’s the hard landscaping finished.  Hopefully, the local Wickes will have some 75mm square x 1.8m posts in stock by the weekend for the sub-base on-top of the paving slabs?  After that onto the office pod base proper, so need to look at ordering some OSB board, 3″ x 2″ joists along with some 75mm thick Kingspan insulation & a breathable membrane.  The corner of the bricks where it meets the lawn looks a bit odd, but the curve will hide most of the bricks there, now covered up again as rain due tonight.

Image